Table of Contents
98-0410: Proposed Modified Text for Methodology for Implementing Scalable Test Configurations.
Overview
Why These Modifications?
Scalable Configurations
Parallel Traffic Replication
Serial Traffic Replication
Example : 4-to-4 Configuration with One Generator
VCC Chain Implementation
Implementation of External Connections
Step 1: Identify the modules to be included in the IUT
Step 2: Connect the generators and analyzers to appropriate ports
Step 3: Establish and number external connections
Example of External Connections
An 8-to-8 Straight Configuration
Implementation of Internal Connections
Internal Connections
Foreground vs Background
Background 6-to-6 Straight Configuration
Foreground 8-to-8 Straight Configuration with 3 Generators
8-to-2 Partial Cross Throughput Foreground Traffic
Foreground 8-to-2 Partial Cross Configuration with 2 Generators
Foreground 8-to-3 Partial Cross with One Generator
Motion |